A well-timed cruise from Fecamp to St Valery en Caux  after a lock delay and disquiet on board. I had been frustrated by the absolute lack of connectivity by use of the harbour Wi-fi or the Vodafone/SFR data sharing facility which was probably due to the very busy traffic on this Bastille Day weekend. I was up early and made my way over to the Tourism Office and used the speed of their Internet and the comfort of their accommodation to put in a good two hours of work on my cruise preparation and cruising web site updates. 

I had thus checked all of the maritime weather web sites and concluded that, though today would not be perfect with winds to the upper end of F4, it would be with the strong tide and so would leave the seas state manageable. 

We were given to believe that the barrier would be opening around 2pm today local time but it was around 2.30pm before it did so. I had been getting quite confused when adjusting for French time and French Summer time and the CA/Imray index was pointing me to the Calais rather than the Dieppe Standard Port tide reference page. However, later on, when I had a chance to study the whole situation properly, I concluded that 2.30pm was indeed the time I should expect the gate to open and our cruise to proceed!

It was a shame because I needed to pay the marina office and return our gate key and they were closed and re-opening at 2pm and so I could have gone there first! As it was, just as soon as we left the inner marina I had to stop at the outer harbour visitor’s pontoon and make my way to the office to complete these chores before we could leave… 

I made  slight increase from 6 to 7 knots for our speed and that still got us to St Valery en Caux 40mins before their High Tide and well within the times for the tidal gate to be opened for us to enter upon arrival. We had to wait until the 5pm bridge lift (as they operate on the hour and half hour during the tidal window) but the bridge controller had replied with that information on VHF Ch9 and so I was well aware and could tie up and wait. He waved us to the Eastern visitor’s pontoon V2 and we could tie up with space to spare alongside and our voyage was completed.

As we settled in, we could hear the sound of live outside music and so I took a walk and learnt that there were still some chops open and the organisers were conducting a sound check for a big open-air festival of music from local performers. We were back later to enjoy the free show!

 Temp 20>30>24 deg C, RH 67>40>50%, Pressure 1025 mb steady, good viz, sm/slight/mod seas with breeze Wly 9 up to 15knots

Cruise Data

Distance: 17 nm

Total Year to date: 610 nm

Leave: 12:25 UTC 14:25 LT

Arrive: 14:50 UTC 16:50 LT

Avg Speed: 7.2 kn

Duration: 2:20 hr

Diesel: 31 ltrs

Mooring:  Fecamp €78.40/ 2 days; St Valery en Caux €65.60/ 2 nights

Electricity: included at Fecamp & St Valery en Caux

Water: included at Fecamp & St Valery en Caux

WiFi:  free but poor at Fecamp, free and good at St Valery en Caux

VHF

Fecamp & St Valery en Caux  Ch 09

Underway Ch 16

Charts

2110.6(a),  2110.5, 2110.6(d)

Waypoints

276, 275, 278>280

Locks and Bridges (All French Time)

Fecamp Bassin Berigny Bridge Hr and Hr:30

Fecamp Freeflow HT -2:30 to HT +045, 14:33 to 17:58

St Valery en Caux Barrier HT -2:30 to HT +1:45, 15:00 to 21:14

St Valery en Caux Bridge Hr and Hr:30

Tides (UTC)

Thursday 13th July:

Dover HW 02:19 6.2, 14:46 6.3; LW 09:44 1.4, 22:11 1.4; 

Dieppe HW 03:03 8.4, 15:30 8.2, LW 10:09 1.6, 22:30 1.9; 

Fecamp HW 02:45 7.7; 15:13 7.60.0, LW 09:24 2.0, 21:42 2.3

Dutch Waterways

Dutch Waterways

Visit dutchwaterways.net for latest updates and to order a copy of the book

Broom Owners Club

Visit broomowners.com for regional events, members pages and details on how to join. 

Journals of David A Broad

Visit davidabroad.com for my daily journal from 1984 to the present day